Tags, chips, lists, stats, timelines, stepper, and the canonical DataTable.
Inline label with optional remove action.
<Tag severity="primary" onRemove={() => {}}>design</Tag>Toggleable filter chip with role=switch.
<Chip selected>Design</Chip>Chip with a result count bubble, for faceted filter bars.
<FilterChip count={42}>Active</FilterChip>Semantic list — bulleted / numbered / checked / plain.
<List variant="checked"><List.Item>…</List.Item></List>Semantic key/value pairs via <dl> / <dt> / <dd>.
<DescriptionList><DescriptionList.Item>…</DescriptionList.Item></DescriptionList>Directional indicator for a metric delta.
<StatTrend direction="up" value="12.4%" period="vs last week" />Compound step indicator. 0-indexed currentStep.
Cart
3 items
Payment
In progress
Confirm
Review & place order
<Stepper currentStep={1}>…</Stepper>Vertical activity timeline with severity accents.
Project created
Idin Studio created the workspace.
Client added
Inviboo was added as a client.
Invoice overdue
Invoice #1042 is 3 days overdue.
Build failed
Node 22 required — Dockerfile pinned 18.
<Timeline><Timeline.Item severity="success">…</Timeline.Item></Timeline>Semantic table with sort + selection. Here with realistic member data.
| Role | Status | |||
|---|---|---|---|---|
| Ada Pranata | ada@inviboo.co | Admin | active | 2024-11-03 |
| Sri Wulandari | sri@efisiensi.id | Owner | active | 2024-09-21 |
| Mark Reinhardt | mark@oem.de | Editor | active | 2025-01-14 |
| Luca Ferrari | luca@legalred.it | Viewer | invited | 2025-03-02 |
| Nadia Hartono | nadia@inviboo.co | Editor | active | 2025-02-18 |
| Bima Saputra | bima@efisiensi.id | Viewer | suspended | 2024-08-07 |
| Ilona Kovač | ilona@oem.de | Admin | active | 2025-01-30 |
| Hiroshi Yamane | hiroshi@pos.jp | Viewer | invited | 2025-04-05 |
<DataTable<User> columns={cols} data={users} rowKey={(u) => u.id} />